1. 當(dāng)拆卸爬坡傳送帶時(shí)。用副斜井運(yùn)輸卷?yè)P(yáng)機(jī)的繩系好爬坡輸送帶向外拉,帶式輸送機(jī)點(diǎn)動(dòng)開(kāi)始。輸送帶完成后,應(yīng)切斷電源,啟動(dòng)下一步。在井口室做好皮帶的工作,皮帶與皮帶頭有信號(hào)接觸,從手動(dòng)開(kāi)始卷繞皮帶,大約200米,停止?jié)L動(dòng)皮帶,撕掉皮帶,用鉛(外觀:用藍(lán)銀)絲帶扎緊扎。
1. When removing the climbing belt. Use the rope of the auxiliary inclined shaft hoist to fasten the climbing belt, pull it outward, and the belt conveyor starts to jog. After the conveyor belt is finished, cut off the power and start the next step. First of all, do a good job in the wellhead room. There is a signal contact between the belt and the belt head. Start winding the belt manually, about 200 meters, stop rolling the belt, tear off the belt, and fasten it with lead (appearance: blue silver) ribbon.
2. 拆下托輥(支撐傳送帶、物料重量和中間機(jī)架),拆下中間機(jī)架(G、N)上的三個(gè)滾筒和直輥,然后手動(dòng)將其運(yùn)地面。四個(gè)人拿著中間的框架一個(gè)人用扳手?jǐn)Q松硬框架的螺絲,四個(gè)人慢慢放下中間的框架。根據(jù)實(shí)際情況調(diào)整中間架,人工抬離地面。使用相同的方法回收中間框架的其余部分。

2. Remove the idler (supporting conveyor belt, material weight and intermediate frame), remove the three rollers and straight rollers on the intermediate frame (g, n), and then transport them to the ground manually. Four people hold the middle frame, one uses a wrench to loosen the screws of the hard frame, and four people slowly put down the middle frame. Adjust the intermediate frame according to the actual situation and lift it off the ground manually. Use the same method to recycle the rest of the intermediate framework.
3.機(jī)器的尾部和轉(zhuǎn)運(yùn)頭應(yīng)由尾部和轉(zhuǎn)運(yùn)頭的車行道頂部的兩根錨索支撐。將落煤槽穿過(guò)錨繩,用索具將爬坡的輸送帶固定,并與馬蹄環(huán)連接,馬蹄環(huán)與鋼絲連接緊密,懸掛5噸鏈條。用鋼絲繩(由鋼絲、繩芯和油脂組成)三個(gè)繩夾將待組裝的設(shè)備綁牢,掛在鏈鉤上。拉動(dòng)小鏈條,使設(shè)備難以裝配。然后手動(dòng)松開(kāi)擱板與基礎(chǔ)之間的連接裝置。,從架子上卸下螺絲,松開(kāi)鏈條,慢慢地把設(shè)備放在地上或放在收割機(jī)上運(yùn)走。
3. The tail and transfer head of the machine shall be supported by two anchor cables at the top of the carriageway of the tail and transfer head. Pass the coal chute through the anchor rope, fix the climbing conveyor belt with the sling, and connect it with the horseshoe ring, which is closely connected with the steel wire, and hang 5 tons of chain. Bind the equipment to be assembled with three clamps of steel wire rope (composed of steel wire, rope core and grease) and hang it on the chain hook. Pull the small chain to make the equipment difficult to assemble. Then manually release the connection between the shelf and the foundation. Finally, remove the screw from the rack, loosen the chain, and slowly put the equipment on the ground or on the harvester to transport away.
Today is the related knowledge of food grade conveyor belt compiled by Xiaobian. For more wonderful content, please click our website: http://www.ujkdbkh.cn Welcome to leave a message on the website, or call to communicate